Sunday 21 July 2013
First Cabinet Dry Fit
Most of the pieces were ready for a dry fit, so I clamped things together so I could choose were I wanted the monitor to sit. Now that is done I can cut out a hole for the monitor.
Sunday 7 July 2013
Control Panel Finished
The final control panel is all drilled out and now I'm ready to start gluing things together.
Newer Posts
Older Posts
Home
Subscribe to:
Posts (Atom)